QA/QC  › Structural Design & Loading  › Structural Design Review
Form · QC-STR-FRM-001

Structural Design Review Process Method Statement

14 checkpoints across 6 sections. Before design review commences; establishes methodology for project
14 Checkpoints
6 Sections
Once per project at design initiation
QA Engineer, Structural Consultant

Checklist Preview

S.No.CheckpointIS RequirementStatus
A. 1. DESIGN REVIEW SCOPE
A1Scope: Definition of what design elements will be reviewed (foundations, superstructure, connections, etc.)
Acceptance: Scope clearly defined; Boundaries identified; Exclusions noted if any
Clause 1.1 — Review scope
OK
NC
NA
HOLD
A2Design review checklist: Reference to checklists (QC-STR-CHK-001, QC-STR-CHK-002, QC-STR-CHK-003) to be used
Acceptance: Checklist IDs listed; Versions specified; Applicable to design items
Clause 1.2 — QC tools
OK
NC
NA
HOLD
B. 2. DESIGN DOCUMENTATION SUBMISSION
B1Design submission format: Calculations (PDF/hardcopy), drawings (PDF/hardcopy), material certs, assumptions documented
Acceptance: Documents clearly identified; Organized in order; Index provided; Searchable
Clause 2.1 — Submission requirements
OK
NC
NA
HOLD
B2Engineer certification: Design engineer signature, stamp, qualification, liability insurance details on submission
Acceptance: Signature & stamp present; Credentials verified; Insurance active; Contact info provided
Clause 2.2 — Professional responsibility
OK
NC
NA
HOLD
C. 3. REVIEW PROCESS & TIMELINE
C1Review timeline: Initial review 5 days, detailed review 10 days, final approval 3 days; milestone dates identified
Acceptance: Timeline specified; Milestones defined; Contingency for revisions included
Clause 3.1 — Schedule
OK
NC
NA
HOLD
C2Review team composition: Design engineer, independent reviewer (QA), client rep; roles and responsibilities defined
Acceptance: Team members named; Roles clear; Escalation path defined; Contact info listed
Clause 3.2 — Team organization
OK
NC
NA
HOLD
C3Review meetings scheduled: Kick-off, mid-review checkpoint, final approval meeting; agendas and outcomes documented
Acceptance: Meetings scheduled; Dates confirmed; Attendees listed; Outcomes recorded
Clause 3.3 — Meeting plan
OK
NC
NA
HOLD
Showing 7 of 14 checkpoints ·
A. 1. DESIGN REVIEW SCOPE
A1Scope: Definition of what design elements will be reviewed (foundations, superstructure, connections, etc.)
Clause 1.1 — Review scope (IS 456)
Scope clearly defined; Boundaries identified; Exclusions noted if any
OKNCNAHOLD
A2Design review checklist: Reference to checklists (QC-STR-CHK-001, QC-STR-CHK-002, QC-STR-CHK-003) to be used
Clause 1.2 — QC tools (IS 456)
Checklist IDs listed; Versions specified; Applicable to design items
OKNCNAHOLD
B. 2. DESIGN DOCUMENTATION SUBMISSION
B1Design submission format: Calculations (PDF/hardcopy), drawings (PDF/hardcopy), material certs, assumptions documented
Clause 2.1 — Submission requirements (IS 456)
Documents clearly identified; Organized in order; Index provided; Searchable
OKNCNAHOLD
B2Engineer certification: Design engineer signature, stamp, qualification, liability insurance details on submission
Clause 2.2 — Professional responsibility (IS 456)
Signature & stamp present; Credentials verified; Insurance active; Contact info provided
OKNCNAHOLD
C. 3. REVIEW PROCESS & TIMELINE
C1Review timeline: Initial review 5 days, detailed review 10 days, final approval 3 days; milestone dates identified
Clause 3.1 — Schedule (IS 456)
Timeline specified; Milestones defined; Contingency for revisions included
OKNCNAHOLD
C2Review team composition: Design engineer, independent reviewer (QA), client rep; roles and responsibilities defined
Clause 3.2 — Team organization (IS 456)
Team members named; Roles clear; Escalation path defined; Contact info listed
OKNCNAHOLD
C3Review meetings scheduled: Kick-off, mid-review checkpoint, final approval meeting; agendas and outcomes documented
Clause 3.3 — Meeting plan (IS 456)
Meetings scheduled; Dates confirmed; Attendees listed; Outcomes recorded
OKNCNAHOLD
Showing 7 of 14 ·
Inspection Sign-Off
APPROVED
APPROVED WITH MODIFICATIONS
REJECTED — RESUBMIT
Remarks / Conditions
Name / Sign / Date
Prepared By
Name / Sign / Date
Approved By (Client)
Name / Sign / Date