QA/QC  › Piping Systems (Plastic)  › Piping Method Statement
Form · QC-PIP-FRM-001

Piping Method Statement

24 checkpoints across 7 sections. Before piping works commence; reviewed at project kickoff
24 Checkpoints
7 Sections
One per project; revised if significant scope changes
QC Engineer, Contractor

Checklist Preview

S.No.CheckpointIS RequirementStatus
A. PROJECT OVERVIEW
A1Scope of Piping Works
Acceptance: Water supply/drainage/specialized lines; areas covered; sizes and lengths documented
Define work extent
OK
NC
NA
HOLD
A2Project Timeline and Phasing
Acceptance: Start date, completion, phases per area; milestone timeline
Execution schedule
OK
NC
NA
HOLD
A3Applicable Standards and Design Codes
Acceptance: IS codes referenced; design pressures; site conditions documented
Regulatory framework
OK
NC
NA
HOLD
B. PIPE & MATERIAL SPECIFICATIONS
B1Pipe Type Selection (UPVC/HDPE/PPR/Copper/Steel as per design)
Acceptance: Type specified per design; justification for each application
Material specification
OK
NC
NA
HOLD
B2Pipe Sizes and Pressure Classes (Dia, Class A/B/C specifications)
Acceptance: Size range, pressure class for each section documented
Performance specification
OK
NC
NA
HOLD
B3Fitting & Valve Specifications (Type, size, pressure rating)
Acceptance: Tees, elbows, valves specified; all ratings ≥ pipe class
Accessory specification
OK
NC
NA
HOLD
B4Adhesive/Jointing Specification (Solvent cement brand, torch for fusion, etc)
Acceptance: Adhesive approved per IS; heat fusion equipment specified if needed
Jointing method
OK
NC
NA
HOLD
C. MATERIAL PROCUREMENT & QUALITY CONTROL
C1Supplier Selection & Approval
Acceptance: Suppliers listed; ISI mark verification; past performance evaluated
Qualified supplier identification
OK
NC
NA
HOLD
C2Receiving Inspection Procedure (Visual, dimensional, certificate checks)
Acceptance: Procedure documented; checklist prepared; test certificates required
Quality control at receipt
OK
NC
NA
HOLD
C3Testing Requirements (Ring stiffness for HDPE, pressure tests, etc)
Acceptance: Test matrix defined; lab identified; sampling plan (5-10% of batch)
Quality verification
OK
NC
NA
HOLD
Showing 10 of 24 checkpoints ·
A. PROJECT OVERVIEW
A1Scope of Piping Works
Define work extent (IS 4985)
Water supply/drainage/specialized lines; areas covered; sizes and lengths documented
OKNCNAHOLD
A2Project Timeline and Phasing
Execution schedule (IS 4985)
Start date, completion, phases per area; milestone timeline
OKNCNAHOLD
A3Applicable Standards and Design Codes
Regulatory framework (IS 4985)
IS codes referenced; design pressures; site conditions documented
OKNCNAHOLD
B. PIPE & MATERIAL SPECIFICATIONS
B1Pipe Type Selection (UPVC/HDPE/PPR/Copper/Steel as per design)
Material specification (IS 4985)
Type specified per design; justification for each application
OKNCNAHOLD
B2Pipe Sizes and Pressure Classes (Dia, Class A/B/C specifications)
Performance specification (IS 4985)
Size range, pressure class for each section documented
OKNCNAHOLD
B3Fitting & Valve Specifications (Type, size, pressure rating)
Accessory specification (IS 4985)
Tees, elbows, valves specified; all ratings ≥ pipe class
OKNCNAHOLD
B4Adhesive/Jointing Specification (Solvent cement brand, torch for fusion, etc)
Jointing method (IS 4985)
Adhesive approved per IS; heat fusion equipment specified if needed
OKNCNAHOLD
C. MATERIAL PROCUREMENT & QUALITY CONTROL
C1Supplier Selection & Approval
Qualified supplier identification (IS 4985)
Suppliers listed; ISI mark verification; past performance evaluated
OKNCNAHOLD
C2Receiving Inspection Procedure (Visual, dimensional, certificate checks)
Quality control at receipt (IS 4985)
Procedure documented; checklist prepared; test certificates required
OKNCNAHOLD
C3Testing Requirements (Ring stiffness for HDPE, pressure tests, etc)
Quality verification (IS 4985)
Test matrix defined; lab identified; sampling plan (5-10% of batch)
OKNCNAHOLD
Showing 10 of 24 ·
Inspection Sign-Off
APPROVED
APPROVED WITH CONDITIONS
REJECTED
Method Statement Summary
Name / Sign / Date
Key Quality Checkpoints
Name / Sign / Date
Material Specification Highlights
Name / Sign / Date
Contractor Representative
Name / Sign / Date
QC Engineer Name
Name / Sign / Date
Engineer-in-Charge
Name / Sign / Date