QA/QC  › Painting & Coatings  › Painting Method Statement
Form · QC-PNT-FRM-001

Painting Method Statement

18 checkpoints across 10 sections. Before painting work starts; required contractual document
18 Checkpoints
10 Sections
Once per project; updated if significant changes required
Contractor, QC Engineer

Checklist Preview

S.No.CheckpointIS RequirementStatus
1. SCOPE & OBJECTIVES
1.1Scope: Define areas to be painted; total area in m²; building/floors/zones identified
Acceptance: Clear identification; total area quantified; special areas noted (high traffic, wet areas)
Cl. 301 — Scope definition
1.2Objectives: State painting standard, finish quality, durability target, maintenance schedule
Acceptance: IS 2395 compliance; 3-5 year touch-up typical; zero defects target
Cl. 301 — Goal setting
2. MATERIALS & SPECIFICATION
2.1Paint specification: Type (emulsion/enamel), brand, grade, color; approval and shelf-life
Acceptance: Approved product; test certs available; storage temp/shelf-life confirmed
Cl. 301 — Material specification
2.2Primer: Type, consumption rate, drying time; compatibility with paint confirmed
Acceptance: Alkali-resistant primer for concrete/plaster; adhesion promoter for smooth surfaces
Cl. 301 — Primer specification
2.3Coverage rates: Primer, undercoat, finish per label; total quantity calculated
Acceptance: Primer 8-12 m²/L; finish 10-15 m²/L; wastage factor 5-10% included
Cl. 301 — Material planning
3. EQUIPMENT & TOOLS
3.1Application tools: Brushes (natural/synthetic), rollers (nap type), spraying equipment if applicable
Acceptance: Quality tools; bristles intact; roller nap 6-10mm; spray gun if large areas
Cl. 301 — Equipment specification
3.2Measuring equipment: DFT gauge calibrated; thermometer; hygrometer; measuring tape
Acceptance: Calibrated ±accuracy; documented; available on site
Cl. 301 — QC equipment
Showing 7 of 18 checkpoints ·
1. SCOPE & OBJECTIVES
1.1Scope: Define areas to be painted; total area in m²; building/floors/zones identified
Cl. 301 — Scope definition (IS 2395)
Clear identification; total area quantified; special areas noted (high traffic, wet areas)
1.2Objectives: State painting standard, finish quality, durability target, maintenance schedule
Cl. 301 — Goal setting (IS 2395)
IS 2395 compliance; 3-5 year touch-up typical; zero defects target
2. MATERIALS & SPECIFICATION
2.1Paint specification: Type (emulsion/enamel), brand, grade, color; approval and shelf-life
Cl. 301 — Material specification (IS 2395)
Approved product; test certs available; storage temp/shelf-life confirmed
2.2Primer: Type, consumption rate, drying time; compatibility with paint confirmed
Cl. 301 — Primer specification (IS 2395)
Alkali-resistant primer for concrete/plaster; adhesion promoter for smooth surfaces
2.3Coverage rates: Primer, undercoat, finish per label; total quantity calculated
Cl. 301 — Material planning (IS 2395)
Primer 8-12 m²/L; finish 10-15 m²/L; wastage factor 5-10% included
3. EQUIPMENT & TOOLS
3.1Application tools: Brushes (natural/synthetic), rollers (nap type), spraying equipment if applicable
Cl. 301 — Equipment specification (IS 2395)
Quality tools; bristles intact; roller nap 6-10mm; spray gun if large areas
3.2Measuring equipment: DFT gauge calibrated; thermometer; hygrometer; measuring tape
Cl. 301 — QC equipment (IS 2395)
Calibrated ±accuracy; documented; available on site
Showing 7 of 18 ·
Inspection Sign-Off
APPROVED
APPROVED WITH MODIFICATIONS
REJECTED
Prepared By
Name / Sign / Date